| Date: |
8-20-2018 |
|
| Number of Hours: |
1.00 |
|
| Brief Description: |
Drilling the doublers onto the front spar of the h |
|
|
I referenced then plans, and marked out all of the holes that needed to be drilled on the doublers that attach to the spar. I then drilled and clecoed the doublers onto the spar. |
||