Date:    3-7-2004
Number of Hours:    5.00
Brief Description:    Engine Work
Moved alternator to align better with the flywheel. Installed the dipstick tube. Installed the exhuast. Installed and connected the EGT probes. Created a permant ground connection to the airframe and the engine case.