| Date: |
3-7-2004 |
|
| Number of Hours: |
5.00 |
|
| Brief Description: |
Engine Work |
|
|
Moved alternator to align better with the flywheel. Installed the dipstick tube. Installed the exhuast. Installed and connected the EGT probes. Created a permant ground connection to the airframe and the engine case. |
||