Date:    4-18-2004
Number of Hours:    6.50
Brief Description:    Misc Firewall forward
Sanded the air inlets epoxied onto the cowl. Installed the purge valve cable bracket. Started installing the engine baffles. Applied a second coat of epoxy and micro balloons to the air inlets.