| Date: |
4-18-2004 |
|
| Number of Hours: |
6.50 |
|
| Brief Description: |
Misc Firewall forward |
|
|
Sanded the air inlets epoxied onto the cowl. Installed the purge valve cable bracket. Started installing the engine baffles. Applied a second coat of epoxy and micro balloons to the air inlets. |
||