| Date: |
1-8-2003 |
|
| Number of Hours: |
0.50 |
|
| Brief Description: |
Wing Conduit |
|
|
Opened the holes in the wing rib to 3/4" and put in nylon tube for a wiring conduit. CVT was used at each rib as a bushing to take up most of the room between the nylon tube and the ribs. |
||