| Date: |
1-10-2004 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
Control Surfaces |
|
|
Bolted elevators and rudder onto the horz. and vertical stab. Installed the rudder stops. Verified the travel to the stops for the elevators and the rudder. |
||