| Date: |
7-4-2002 |
|
| Number of Hours: |
3.00 |
|
| Brief Description: |
Balance Elevators |
|
|
Clamped the horizontal stab to the bench and leveled it per the plans. Mounted the elevators and bolted on the pre-cast weights. Right side heavy, left side light. |
||