Date:    1-5-2002
Number of Hours:    10.50
Brief Description:    Electric Flap Actuator Installation
1/1/02 and 1/5/02 - Installed the electric flap actuator mechanism and weldment. Cut and trimed the side panels of the enclosure, drilled all holes for the assembly. Will need priming before it can be riveted together.