| Date: |
3-12-2009 |
|
| Number of Hours: |
3.90 |
|
| Brief Description: |
Deburred and treated LHS with Zinc Oxide |
|
|
Of these hours, 0.5 were Carole's. Took apart the clico'd LHS and deburred all drilled holes. Treated all mating surfaces with Zinc Oxide and left to dry overnight. No photos as all the parts are spread out on tables drying. |
||