Date:    3-1-2009
Number of Hours:    4.90
Brief Description:    Fabricated diagonal L sections for RHS, drilled, c
Of these hours 2.1 of them were by Carole.

Fabricated the L sections which crisscross the side of the fuselage. Then clamped them on, drilled from the tiny holes on the skin, and cleco'd them in place. About half done with this.

I have spent a lot of time trying to anticipate the connection of the rear fuselage piece to the front piece so as to prepare the side panel optimally.