| Date: |
7-14-2010 |
|
| Number of Hours: |
49.30 |
|
| Brief Description: |
Build left wing |
|
|
The left wing was of course similar to the completed right wing, so less description and photos were required. This period was filled with trips, visitors and a reunion so the work has proceeded slowly. During this period, the entire project was moved to the Ceday City hangar with the help of JIm Rosser, Ron Lewis (whos hay trailer was essential to move the wings), and Barrie Strachan. All provided pickups and trailers. The hours were accumulated as follows with almost all of it devoted to the left wing. Date RR CJ 6/1/2010 2.0 2.0 6/2 2.8 2.8 6/4 1.2 1.2 6/5 1.5 1.5 6/6 3.2 3.2 6/9 1.8 1.8 6/10 0.8 0.8 6/11 2.5 2.5 6/12 1.4 1.4 7/10/2010 3.8 3.8 7/11 2.9 2.9 7/12 1.0 7/13 1.0 __________________________ 25.9 23.4 Since the photos would look just like the right wing, few were taken. None included here. |
||