| Date: |
4-26-2018 |
|
| Number of Hours: |
1.50 |
|
| Brief Description: |
VA-146 Bearing and HS-810-1/HS-814-1 Work |
|
|
With VA-146 dry, I was able to assemble the bearing and HS-411APP/HS-411BPP, and set the first rivets in the kit. The rest of today's time was spent getting a rough shape on HS-810-1 and HS-814-1. |
||