| Date: |
1-8-2007 |
|
| Number of Hours: |
3.00 |
|
| Brief Description: |
Install airleron pushrods and prep strobe lights |
|
|
The left airleron and flaps hinges were installed. Then the pushrods for the left airleron were installed. The left fiberglas wing tip was fitted and installed with #40 clecoes. When the wingtip was satisfactory, I installed the strobe light and left the final connection to tomorrow. Drill to #30 and install strobe light connections tomorrow |
||