| Date: |
1-22-2007 |
|
| Number of Hours: |
5.00 |
|
| Brief Description: |
Make main gear fairing and canopy attach hook |
|
|
The main gear fairing blanks were laid out and cut to shape. One of the fairings was folded arounf a 1" dia nylon dowel. The Caonnpy attach hook was made lfrom 2.5x2.5x1/8 angle like Jeff Shultz's with a second cutout to permit ventilation while taxiing. |
||