| Date: |
12-7-2006 |
|
| Number of Hours: |
3.00 |
|
| Brief Description: |
Getting #9 Left aft rib ready to rivet |
|
|
The four support clips were located and fastened to support rails, drilled to #40 then #30 and deburred. The bell crank was locate and drilled to size. Everything was disassembled, deburred and reassembled, ready to rivet. |
||