| Date: |
7-29-2009 |
|
| Number of Hours: |
1.00 |
|
| Brief Description: |
Mount main spar in jig and level |
|
|
Fabricated a leveling jack for the center of the rear spar using some scrap 2x6 lumber, 3/8" threaded rod and some nuts and washers. I stretched a line from the spar root to the tip and adjusted the jack until the spar was level. It was also necessary to fabricate a support bracket to attach the tip rib to the jig. |
||