| Date: |
5-16-2009 |
|
| Number of Hours: |
1.00 |
|
| Brief Description: |
Prepared the vertical stab skin for assembly |
|
|
Deburred all rivet holes and the edges of the vertical stabilizer skin (scotchbrite wheel with die grinder). Checked preloading on the DRDT-2 and dimpled the stab skin. Clecoed the vertical stabilizer skin to the skeleton in preparation for final riveting. |
||