| Date: |
10-20-2008 |
|
| Number of Hours: |
0.70 |
|
| Brief Description: |
Continue initial assembly of left elevator |
|
|
Removed the clecos holding the root rib (E-705) to the spar and then clecoed/drilled the elevator horn (WD-605-1-L) to the spar and root rib. Clecoed and final drilled the trim spar (E-606PP) to the root rib (E-705).. Match drilled the E-701-L skin to the understructure. |
||