Date:    8-28-2008
Number of Hours:    1.80
Brief Description:    Match drilled vert stab skin to skeleton
Clecoed the vertical stabilizer skin (VS-801PP) to the stab skeleton.

Match drilled to final size all holes attaching the skin to the skeleton.

Marked the locations and orientation of VS-803PP, VS-411PP and VS-412PP.