| Date: |
8-28-2008 |
|
| Number of Hours: |
1.80 |
|
| Brief Description: |
Match drilled vert stab skin to skeleton |
|
|
Clecoed the vertical stabilizer skin (VS-801PP) to the stab skeleton. Match drilled to final size all holes attaching the skin to the skeleton. Marked the locations and orientation of VS-803PP, VS-411PP and VS-412PP. |
||