| Date: |
8-28-2008 |
|
| Number of Hours: |
0.30 |
|
| Brief Description: |
Attached doubler and hinge brackets to spar |
|
|
Clecoed the spar doubler (VS-808PP) to the rear spar (VS-803PP). Clecoed the hinge brackets VS-410PP, VS-411PP and VS-412PP to the spar. |
||