| Date: |
8-24-2008 |
|
| Number of Hours: |
0.10 |
|
| Brief Description: |
Begin horiz stab front spar assembly |
|
|
Clecoed the horiz stab front spar angles (HS-810-1 and HS-814-1) to the front spar channels (HS-702s). Match drilled all holes inboard of the HS-404/HS-405 rib attach points (see view A-A) No holes drilled for attaching the HS-404 and HS-405 ribs or outboard of the bend liines (to be final drilled after bends are made). |
||