| Date: |
2-3-2016 |
|
| Number of Hours: |
6.00 |
|
| Brief Description: |
Riveted the port rear baffle assembly together |
|
|
Riveted the port rear baffle components together. Fabricated the tubing spacers for the oil coller bolts and temporarily installed the cooler. The entire assemboly was test fitted onto the engine. |
||