| Date: |
9-12-2014 |
|
| Number of Hours: |
10.00 |
|
| Brief Description: |
Began work on prop spinner |
|
|
Today was a long day fabricating the spinner bulkhead and backing plate with doubler. The 13" backing plate had to be cut to match the doubler. This was primarily a fly cutter operation (very carefully accomplished on a drill press). Once the main plate was cut it was match drilled, deburred, prepared and primed. Finally, the backing plate was riveted to the doubler. |
||