Date:    9-14-2014
Number of Hours:    6.00
Brief Description:    Worked on propeller spinner
Today I checked and rechecked the spinner to be sure it is centered. Also checked the propeller pitch changes stop-to-stop to be sure there will be no interference as theprop is exercised full range.

Next I match drilled the fiberglass spinner to the two plates. All the nutplates were then installed and the spinner was placed back on the prop in preparation for fabricating the fillets.