| Date: |
4-9-2016 |
|
| Number of Hours: |
3.50 |
|
| Brief Description: |
Initial visit |
|
|
Brought Lindsay up to speed on the general state of the project. Reveiwed the existing documentation and supplied the project website. Lindsay checked the work that I had done on the Ailerons and the general state. We spent a lot of time discussing what to do next and it was decided that I should break the project into major assemblies and work through ALL the defects and modifications for that assembly. The major assemblies are as follows: Canard, Fuel, Electrics, Avionics, Instrumentation, Forward fuselage, Aft fuselage, Controls. Canard; Brake system; Master cylinders, Slave cylinders/actuators brake lines. Main wheels; Balancinig, fitting, Pitiot head; Fitting and plumbing, Elevators: Repair. Fitting. Trim. Rigging. Access panels; Repairs. |
||