| Date: |
1-16-2007 |
|
| Number of Hours: |
1.50 |
|
| Brief Description: |
Right Leading Edge |
|
|
It was too cold to prime outside this evening so we got the leading edge ribs riveted to the spar. Reva bucked where she could see and I shot the rivets. The ones that had to bucked in the blind, I bucked and she shot them. I still put pop rivets in two ribs that neither of us were comfortable with. I figured good pop rivets were better than tipping solid rivets or having to drill out bad ones. We then riveted the spar line on the top of the wing. |
||