| Date: |
11-5-2008 |
|
| Number of Hours: |
2.50 |
|
| Brief Description: |
Control Rods |
|
|
Put the ends in both elevator control rods . Set the bellcrank vertical and the elevators to neutral and set the nuts on the control rod. Removed the elevators and started fitting the Vertical Stabilizer. |
||