| Date: |
1-1-2016 |
|
| Number of Hours: |
1.50 |
|
| Brief Description: |
VS Mods | Final drill common holes between VS skel |
|
|
Final drill common holes between VS skeleton and VS skin using #40 drill bit. Decided to do the following mod to the VS. Drill a hole in VS1006 top rib to accommodate a conduit so that I can run wire / cable to the VS tip fairing. This would allow placing a camera or antenna there and having power or comm or signals routed there later. Conduit ordered from Van's. The conduit will be attached to the VS using wire-ties and will not touch the VS skin. Parts ordered from www.mouser.com |
||