| Date: |
9-17-2014 |
|
| Number of Hours: |
8.00 |
|
| Brief Description: |
Rebuit the connectors on the Rotator. |
|
|
Reengineered both of the connectors to the aircraft to allow three degrees of freedom so as not to torque the airframe. |
||