| Date: |
4-7-2016 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
UP MICRO SWITCH |
|
|
1 Swing the nose gear to the fully retracted position. 2 Find the loction for the switch that will cause the switch to close when the nose gear is retracted. 3 Match drill the switch to the uostop brce then attach using the hardware provided with the switch. 4 Connect the switch to the electricl harness. 5 Lower and retract the nose gear several times to test the action of the switch. |
||