| Date: |
4-7-2016 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
NOSE DOOR GAS STRUT |
|
|
THE FOLLOWING IS DONE AFTER THE NOSE GER HAS BEEN ALIGNED AND BOLTED TO THE ENGINE MOUNT. 1 Install the ball stud into thr bracket. 2 Install the ball tud to the nose gear. 3 Attach the gas strut to the ball stud in the bracket. 4 Insert the gas strutinto the tunnel bove te gear door open/closer ad the upstop brace. 5 Fully extend the nose gear. With the gas strut fully extended hold the tip with the rod end apporx 1 inch past the ball stud. 6 Locate the position of the gas strut attachment in the tummel. Match drill the bracket to the tunnel. 7 Bolt the brackets to the tunnel 8 Attach the gas strut to the ballstuds on the nose gear and on the bracket i the tunnel. |
||