Date:    4-7-2016
Number of Hours:    4.00
Brief Description:    DC CONTROL
INSTALL THE DC CONTROL ON THE FLOOR OF THE FUSALAGE BETWEEN THE FORWARD AND AFT SHEARBOXES.

1 Position the DC control approximately 2 " forward and on the right side of the left passthrough. Ensurenthe module doew not interfere with ny aircraft systems or components.

2 Attach the DC control to the aircraft using stud mounts, washers, and nuts.