| Date: |
4-7-2016 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
GROUND BUS BLOCK AND PRIMARY BUS BLOCK |
|
|
THESE BLOCKS ARE INSTALLED UNDER THE FLOOOR PANEL IN THE PILOTS FOOTWELL. 1 Make a mounting block out off g10 1/4 phenolic sheet the size of the block base. 2 Prepare mounting screws to attach the bus block to the phenolic base ( length as required). 3 bond the mounting block to the aircraft fusalage at the locations in fig 19.N.2.1. 4 After the flox has fully cured. Secure the bus blocks to the phenolic block bases. |
||