Date:    5-21-2015
Number of Hours:    2.00
Brief Description:    FLAP POSITION SENSOR INSTLLATION
FLAP POSITION SENSOR INSTALLTAION.

DRILL A 1/16 HOLE BELOW THE TOP BOLT HOLE OF THE FLAP MECHANISM LINK.

REF TO FIG 6.2.K.1