Date:    5-16-2015
Number of Hours:    0.00
Brief Description:    INSTALLATION OFF ELEVATOR TORQUE TUBE
INSTALL THE ELEVATOR TORQUE TUBE TO THE AFT FACE OF THE RAR SHEAR BOX.
FIG 3.2.L.2.
ASSEMBLE ELEVATOR AFT CONTROL HORN/ AFT PRESSURE BULK HEAD.
FIG 3.2.L.3