| Date: |
2-29-2016 |
|
| Number of Hours: |
6.00 |
|
| Brief Description: |
ASSEMBLING THE AFT MANIFOLD |
|
|
THE MANIFOLD MAY BE ASSEMBLED BEFORE ATTACHING THE THE FUSALAGE. 1 REF TO FIG 11.2.A.1 AFT MANIFOLD COMPONENTS. ENSURE THE COMPONENTS PROPERLY SEAT INTO THE MANIFOLD. TIGHTEN THE COMPONENT FIRMLY, BUT DO NOT OVER TIGHTEN. 2 COUNTER BALANCE VALVE: SCREW THE COUNTER BALANCE VALVR ( 412-0009) INTO THE MANIFOLD BODY. TORQUE 30 TO 35 FT-LBS. 3 SOLENOID VALVE ( TYPICAL TWO) THE SOLENOID VALVE IS A TWO PIECE COMPONENT COMPOSED OF A VAVLE ( 412-0007) AND THE SOLENIOD (412-0008) SCREW THE VAVLE ( 412-0007) INTO THE MANIFOLD BODY. REMOVE THE END NUT ON THE VALVE AND SLIDE THE SOLENOID OVER THE VAVLE BODY. ATTACH THE SOLENIOD USING THE END NUT. 4 CHECK SCREW: SCREW THE CHECK VALVE INTO THE MANIFOLD BODY. ENSURE THE VAVLE IS INSTALLED WITH THE DIRECTION OF FLOW INTO THE MANIFOLD. 5 PRESSURE SWITCH: SCREW IN THE PRESSURE SWITCH. 6 BALL VAVLE AND PRESSURE GAUGE: SCREW THE GAUGE INTO THE MANIFOLD, ENSUREING THE GAUGE CAN BE SEEN. |
||