| Date: |
2-29-2016 |
|
| Number of Hours: |
4.00 |
|
| Brief Description: |
INSATLLING THE FT MANIFOLD |
|
|
THE AFT MANIFOLD IS LOCATED AFT OF THE REAR SHEAR BOX ON THE LEFT SIDE OF THE FUSALAE. THIS MANIFOLD CONTROLS THE PRESSURE AND FLOW OF THE HYD SYSTEM. 1 MOUNT THE MANIFOLD ON A PIECE OF PHENOLIC 5 1/5" X 3" X 1/8" 2 MATCH DRILLTHE PHENOLIC FOR THREE #10 FLATHEAD SCREWS USING THE THREE HOLES IN THE MANAIFOLD. THESE ARE USED TO MOUNT THE MANIFOLD TO THE PHENOLIC. 3 INSERT THE SCREWS ( MS24694) FROM THE BACK SIDE OF THE PHEMOLIC. AKE SURETHEY ARE LONG ENOUGH TO ACCOMODATE THE FOLLOWING. PLACE 10 STCKED WASHERS ( AN960-10L) OR ALUMINUM TUBEING CUT TOSIZE ON EACH OF THE SCREWS AS A STANDOFF TO ACCOMODATE THE CURVATURE OF THE FUSALAGE. INSTALL THE MANIFOLD ONTO THE SCREWS. SECURE WITH WASHERS ( AN960-10) AND NYLOCK NUTS (AN364-1032A). 4 LOCATE THE PHENOLIC BLOCK, WITH THE MOUNTED MANIFOLD. . 11" FROM THE BACK OF THE SHER BOX TO THE ENDOF THE MANIFOLD BODY NEXT TOTHE SCREW. .5" BELOW THE BOTTOM OF THE FLOOR PANEL . 1" FORN THE BOTTOM OF THE MANIFOLD TO THE FUSALAGE . USE THE RETURN LINE, PRESSURE LINE, GEAR UP AND GEAR DOWN LINE TO ENSURE CORRECT LOCATION. . LEVEL THE PHENOLICE BLOCK. 5 BOND THE PHENOLIC BLOCK TO THE FUSALAGE WITH FLOX. 6 ATTACH THE HYD LINES TO THE MANIFOLD. |
||