Date:    2-23-2016
Number of Hours:    2.00
Brief Description:    THERMO RELIEF VALVE
THE THERMO RELIEF VAVLE IS INSTALL IN THE HIGH PRESSURE LINE BETWEEN THE ACCUMULATOR AND THE AFT MANIFOLD.

1 INSTALL THE THERM RELIEF VAVLE WHEN THE PIPING FROM THE ACCUMULATOR TO THE AFT MANIFOLD IS INSTALLED.

2 MAKE A PLATFORM OUT OF PHEMOLIC. 8 BID GLASS, 08 G-10 OR 8 BID CARBON LAYUP, WHICH TO MOUNT THE THERMO RELIEF VAVLE.

3 PLACE ADEL CLAMPS AROUND THE THERMO RELIEF VALVE AND MATCH DRILL TWO HOLES THROUGH THE PLATFORM TO ACCEPT THE SCREWS FOR THE CLAMPS.

4 MOUNT THE SCREWS TO THE PLATFORM

5 BOND THE PLATFORM TO THE FUSALGE USING FLOX

6 ATTACH THE PIPIG CONNECTING THE VLVE BETWEEN THE RESERVIOR/PUMP UNIT ANF THE AFT MANIFOLD.