| Date: |
2-23-2016 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
THERMO RELIEF VALVE |
|
|
THE THERMO RELIEF VAVLE IS INSTALL IN THE HIGH PRESSURE LINE BETWEEN THE ACCUMULATOR AND THE AFT MANIFOLD. 1 INSTALL THE THERM RELIEF VAVLE WHEN THE PIPING FROM THE ACCUMULATOR TO THE AFT MANIFOLD IS INSTALLED. 2 MAKE A PLATFORM OUT OF PHEMOLIC. 8 BID GLASS, 08 G-10 OR 8 BID CARBON LAYUP, WHICH TO MOUNT THE THERMO RELIEF VAVLE. 3 PLACE ADEL CLAMPS AROUND THE THERMO RELIEF VALVE AND MATCH DRILL TWO HOLES THROUGH THE PLATFORM TO ACCEPT THE SCREWS FOR THE CLAMPS. 4 MOUNT THE SCREWS TO THE PLATFORM 5 BOND THE PLATFORM TO THE FUSALGE USING FLOX 6 ATTACH THE PIPIG CONNECTING THE VLVE BETWEEN THE RESERVIOR/PUMP UNIT ANF THE AFT MANIFOLD. |
||