Date:    2-23-2016
Number of Hours:    20.00
Brief Description:    ROUTING HYDRAULIC LINES
THE HYDRAULIC LINES ARE HELD OFF THE FUSELAGE BY USING STAND OFFS, POSITION STAND OFFS. DETRERMINE THE BEST LOCATION ONCE THE LINES HAVE BEEN ROUTED

1 AFTER LAYING OUT AND INSTALLING THE HYDRAULIC LINES, DETERMINE THE MOST SUITABLE LOCATION FOR THE STAND OFFS.

2 CLIP THE STAND OFFS TO THE PIPING. THE STANDOFFS MAY BE RAISED OR LOWERD AS REQUIRED, BY APPLYING FLOX RELEASE TO THE BOTTOM OF THE STANDOFFS

3 AFTER FLOX HAS CURED. MATCH DRILL THROUGH THE BLIND RIVET HOLES TO ALLOW INSTALLATION OF THE RIVET TO THE FUSELAGE. DRILL ONLY AS AS REQUIRED FOR THE RIVET.

4 INSTALL RIVETS

AFT MANIFOLD ND FWD MANIFOLD.

1 CUT AND DRILL A PIECE OF 1/4 THICK PHENOLIC AS SHOWN I FIG 11.2.L.2. THIS IS TO SUPPORT THE FITTING ANS HYD LINES, AS THEY CONNECT TO THE MANIFOLD AND PASS THROUGH THE SHEAR BOX PASSTHROUGH.

2 BOND TO THE FUSALAGE USING FLOX AND 2 BIDS OF CARBON LAYUP ON EACH SIDE.

3 INSTALL THE FITTINGS AND HYD LINES. ROUTE THE THREE LINES UNDER THE CENTER FLOOR BOARD AND THROUGH THE SHEARBOX PASSTHROUGH