| Date: |
5-27-2015 |
|
| Number of Hours: |
6.00 |
|
| Brief Description: |
INSTALL AILERON HARDWARE |
|
|
ASSEMBLE THE FLOATING HINGE.. ASSEMBE WHEN AILERONS ARE MATED TO THE WING. ASSEMBLE AND INSTALL THE OUTBOARD HINGES. HINGE (150-0049) FIG 7.2.A.2 INSTALL AILERON INBOARD HINGE BRAKETS (209-0066) FIG 7.2.A.3 INSTALL THE IDLER ARM ASSEMBLIES ( 200-0051) FIG 7.2.A.4 INSTALL THE 3D BELLCRANKS. ASSEMBLE AND INSTALLATIONOF THE LEFT AND RIGHT BELLCRANK ASSEMBLIES IS SIMILAR. HOWEVER THE LEFT BELLCRANK ( 242-0017) AND THE RIGHT BELLCRANK (242-0018) MUST BE USED IN THEIR RESPECTIVE ASSEMBLIES. INSERT TWO BEARINGS WITH THE SPACER AND WASHER. BEARING ( 110-0017)SPACER (117-0026)WASHER (242-0018).INTO THE BELLCRANK. PLACE THE DOUBLER SHEAR BASE ( 219-0009) AND THE BASE ( 219-0007) TOGETHER SO THAT THE END OF THE BELLCRANK WITHTHE BEARING INSERT CAN BE ATTACHED USING THE DRILLED BOLT HEAD ( AN4H-17A) AND TWO WASHERS ( AN960-10L) INSERT BOLTS (AN3H-17A ) AND WASHERS ( AN960-10L)INTO REMIANING HOLES IN THE BASE ASSENBLY. ATTACH THIS PORTION OFF THE ASSEMBLY ON TO THE WING AT THIS TIME. ATTACHTHE ARM (200-0143) USING BOLT ( AN3-6A) ATTACH THE BRAKET TO THE AILERON. ( 209-0143) USING BOLTS ( AN3-5A) ATTACH THE BELLCRANJ TO THE BRAKET USING BOLTS (AN3-6A) TAPER WASHER (CD315-12) NOTE ENSURE THE UP INDICATION IS MOUNTED WITH THE ARROW POINTING UP TORQUE TO 20 TO 25 IN-LBS. APPLY TORQUE SEAL. |
||