Date:    5-27-2015
Number of Hours:    15.00
Brief Description:    INSTALLING THE AILERON CONTROL SYSTEM
CUT PUSH PULL ROD TO LENGTH.

TABLE 7.2.G.1 OVER ALL LENGTH.

TABLE 7.2.G.2 PUSH PULL ROD IN BOARD.

TABLE 7.2.G.3 PUSH PULL ROD OUT BOARD.

TABLE 7.2.G.4 PUSH PULLROD CENTRE.

INSTALL THE CONTROL STICK.
PLACE CONTROL STICK INTO AILERON TORQUE TUBE.
SECURE WITH BOLT ( AN4-16A) WASHER (AN960-416L) AND LOCK NUT ( AN365-428A)

TIGHTEN SO THAT THERE IS NO SLOP IN THE STICK.
INSTALL THE TORQUE TUBES USING BOLT (AN4-14A) WASHER (AN960-416L) AND NUTS (AN365-428A)

AILERON HARD POINT.
WERE THE TORQUE TUBE CONTACTS THE SKIN AT THE CONTROL STICK LOCATION CREATE A HARD POINT 1 1/2" TO 2". FIG 7.2.G.7