| Date: |
5-27-2015 |
|
| Number of Hours: |
1.00 |
|
| Brief Description: |
CONTROL STICK FORCES |
|
|
AFER AILERON AND ELEVATORS HAVE BEEN RIGGED AND THE CONTROL GRIPS HAVE BEEN INSTALLED, TEST THE FORCES REQUIRED TO MOVE THE CONTROL STICK, USING THE PRODCEDURES IN CHAPTER 19 ELECTRICAL AND AVIONICS. ITEM 19 2.K |
||