| Date: |
1-12-2016 |
|
| Number of Hours: |
8.00 |
|
| Brief Description: |
AFT PRESSURE BULKHEAD FITTING |
|
|
TWO PENETRATIONS THROUGH THE BULKHEAD ARE REQUIRED FOR THE BOOT INSTALLATION. ONE PENETRATION IS FOR THR 5/8 SOURSE LINE THAT PULLS PS3 AIR FROM THE FIRWALL FITTING. THE REMAINING PENERTRATION IS FOR THE 3/8 FITTING THAT PULLS AIR FROM HARDWARE ( EJECTOR ASSEMBLY) TO THE WING BOOTS 1 LOCATE AND DRILL TWO HOLES IN THE AFT PRESSURE BULKHEAD ABOVE THE FLOOR LEVAL TO THE RIGHT SIDE OFF TE AIRCRAFT. 2 DECORE THE HOLES AND PACK WITH FLOX. 3 LAY CABON FIBER THREE BID LAYUP OVER THE HOLES. 4 INSTALL FITTINGS AN833-10D AND AN807-6D. 5 FIT EITHER 90 DEG ADAPTER ( FCM1534 ) OR STRAIGHT ADAPTER ( FCM1514) AS REQUIRED FOR BESTHOSE ROUTING. |
||