| Date: |
1-12-2016 |
|
| Number of Hours: |
6.00 |
|
| Brief Description: |
TAIL |
|
|
TEE FITTING IN THE LEADING EDGE . D SECTION OF THE HORIZONTAL SATIBILIZER, TO SUPPLY AIR TO THE TAIL BOOTS. 1 LOCATE AND DRILL A 1.125 ACCESS HOLE VERTICALLY THROUGH THE HORIZONTAL STABILIZER ON THE AIRCRAFT CENTRLINE , AS FAR FORWARD IN THE D SECTION AS POSSIBLE. ROUTE SUPPLY HOSE THROUGH THIS HOLE TO TEE ASSEMBLE. 2 ASSEMBLE TEE AN917-2 WITH 3 N840-6D ADAPTERS 3 CONNECT ONE SIDEOF THE TEE ASSEMBLY TO A BOOT USING EXTRA 3/8 HOSE, LEAVING EXCESS HOSETO ALLOW TEE TEE FITTING TO BE PULLED TO OPPOSITE HORIZONTAL AND CONNECT TO THE OPPOSITE TAIL BOOT. 4 ONCE BOOTS ARE CONNECTED THE FEED LINE CN BE CONNECTED. 5 ROUTE HOSE FROM HARDWARE ASSEMMBLY THROUGH THE REAR EMPANAGE ( FIG 31.2.H.2 ) AND UP THROUGH THE NEW HOLE ( DRILLED IN STEP ONE) IN THE HORIZONTAL STAB . |
||