| Date: |
3-12-2018 |
|
| Number of Hours: |
3.00 |
|
| Brief Description: |
Worked with poylmer bushings |
|
|
Final drilled the pivot hole in the F-1287C Link. Deburred the F-1287C Link and the F-1287A Tray. Inserted the polymer bushing into the F-1287C Link, and the F-1287A Tray. Filed the bushings instered. Authored by Dane Wedge. |
||