| Date: |
4-19-2018 |
|
| Number of Hours: |
3.00 |
|
| Brief Description: |
Began installation of vertical stabilizer |
|
|
Michael, and Pierceton. Began to align vertical stabilizer to the tail cone with the AN3 bolts called out (Steps 1-3). Installation of Lower Hinge Assemlbe could not be completed as the holes match drilled previously did not align with the vertical stab.This has been redone. |
||