| Date: |
9-30-2014 |
|
| Number of Hours: |
1.00 |
|
| Brief Description: |
Attach and drill out flap and aileron gap fairings |
|
|
Found correct fairings and fit to spar / skin. Drilled out holes to size and back drilled 4 holes not already in spar |
||