| Date: |
8-30-2014 |
|
| Number of Hours: |
1.50 |
|
| Brief Description: |
Double checking all CS holes in main spar |
|
|
Main spar rivet holes (3-xx) need checking. Some are not deep enough. Re-set counter sink and double checking each hole. (with test fits between skin and spar). Ran cs through all holes. Re-Alodined holes. |
||