| Date: |
1-8-2015 |
|
| Number of Hours: |
1.50 |
|
| Brief Description: |
Begin / re start right flap |
|
|
Cleaned up entire work area, copied pages for flap constructions, gathered notes from left flap assembly. Clecoed FL-906B-R to fab rib and clamped to FL906A angle. Everything firmly clamed and clecoed. Drilled out #30 holes (4-x rivets) on 906 A&B. 10 holes. |
||