| Date: |
7-25-2013 |
|
| Number of Hours: |
3.00 |
|
| Brief Description: |
Build frame / install posts for wing spar |
|
|
Installed 4x4 posts. One was glued to floor and screwed to ceiling (bracing boards screwed into ceiling joists). Second post was tied, using 2x4, to original post and wall. |
||