| Date: |
6-2-2013 |
|
| Number of Hours: |
2.00 |
|
| Brief Description: |
Trim lead counterweights and install on elevators |
|
|
Trimmed lead counter weights with new scroll / table (small) saw. Took a long time and lead gets HOT. Finally got good trim / shape. Had to sand down a bit to get past rivet heads. Torqued bolt nuts. Installed elevator on Horizontal stab. good fit. |
||